|
|
| |
|
|
Salzgitter signs major hydrogen pipeline contracts for Germany's core network-Metal Exhibition-Steel Exhibition-2026 Chi na (Guangzhou) International Metal & Metallurgy Industry Exhibition 3/5/2026 金属展-冶金展-钢铁展-steel expo-metal & metallurgy expo |
--------------------------------------------------------------------------------------------------------------- |
|
German steelmaker Salzgitter AG has announced that it has signed significant line pipe contracts with ONTRASGastransport GmbH for the construction of a new hydrogen pipeline forming part of Germany''s hydrogen core
network.
Within the scope of the contracts, Salzgitter subsidiaries Mannesmann Grossrohr GmbH (MGR) andMannesmann Line Pipe GmbH (MLP) will provide line pipes for 70.6 km, equivalent to approximately 18,000 mt,and pipes for an additional 38.2 km, totaling around 6,000 mt, respectively.
FGL 702 project supports green steel transition
The pipes are designated for the FGL 702 hydrogenpipeline, which will run from Wefensleben to Salzgitterand from Angersdorf to Preuslitz.
The project represents a critical infrastructurecomponent within Germany''s hydrogen core networkand plays a strategic role in enabling the country''senergy transition. It is also directly linked to Salzgitter''sSALCOS@ low-carbon steelmaking transformationprogram, under which the company is gradually
converting its integrated steelworks to low-carbon production routes.
Technical specifications and delivery timeline
MGR willsupply pipes with a diameter of 813 mm, featuring a three-layer polyethylene external coating and aninternal epoxy Flowcoat. Around 4.5 km of this section will also receive an additional glass-reinforced plastic(GRP)coating.
MLP will deliver pipes with a 610 mm diameter and 18-meter length. These pipes will also be equipped with athree-layer polyethylene external coating and an internal Flowcoat lining applied at the Hamm facility to reducefriction losses during hydrogen transport. Approximately 6 km of the pipeline section will include additional GRPcoating.
Deliveries are scheduled to begin in February 2027, with pipes transported to designated storage sites ahead ofinstallation.
金属展-钢铁展-冶金展-2026广州巨浪国际金属暨冶金工业展览会-Metal Exhibition-Steel Exhibition-2026 China (Guangzhou) International Metal & Metallurgy Industry Exhibition
2026金属展,2026金属展会,2026金属展览会,2026广州金属展,2026广州金属展会,2026广东金属展,2026广东金属展会,2026中国金属展,2026中国金属展会,2026金属博览会,2026冶金展,2026冶金展会,2026冶金展览会,2026广州冶金展,2026广州冶金展会,2026广东冶金展,2026广东冶金展会,2026中国冶金展,2026中国冶金展会,2026冶金博览,2026钢铁展,2026钢铁展会,2026钢铁展览会,2026广州钢铁展,2026广州钢铁展会,2026广东钢铁展,2026广东钢铁展会,2026中国钢铁展,2026中国钢铁展会,2026钢铁博览会,2026金属冶金展,2026金属冶金展会,2026金属冶金展览会,2023广州金属冶金展,2026广州金属冶金展会,2026广东金属冶金展,2026广东金属冶金展会,2026中国金属冶金展,2026国金属冶金展会,2026金属冶金博览会-steel Industry Exhibition,steel expo, 2026 steel exhibition, 2026 steel expo, China steel exhibition, China steel expo, steel Industry event,steel event, 2026 steel event, China steel event,metal Industry Exhibition,metal expo, 2026 metal exhibition, 2026 metal expo, China metal exhibition, China metal expo, metal Industry event,metal event, 2026 metal event, China metal event,metallurgy Industry Exhibition,metallurgy expo, 2026 metallurgy exhibition, 2026 metallurgy expo, China metallurgy exhibition, China metallurgy expo, metallurgy Industry event,metallurgy event, 2026 metallurgy event, China metallurgy event,Metal & Metallurgy Industry Exhibition 2026,China Metal & Metallurgy Industry Exhibition,Metal & Metallurgy Exhibition 2026,China Metal & Metallurgy Industry Exhibition 2026
内容摘抄于网络,如有侵权,请联系删除 020-38620785,zheng@julang.com.cn
|
|
|
|
|