Home AboutUs Exhibition
Info
News
Center
Exhibitor
Manual
Cost of
Participation
Floor
Plan
Exhibition
Retrospect
Media
Support
Contact Chinese
 News Type
Exhibition News
Industry News
Company News
Media reports
 New Detail
     
Golden Predator Drilling Update for Brewery Creek Mine-The 21st China (Guangzhou)Int’l Fastener & Equipment Exhibition
3/3/2020  fastener expo
---------------------------------------------------------------------------------------------------------------
    Golden Predator Mining Corp has reported additional positive drill results from its 2019 drill program at its 100% owned and licensed Brewery Creek Mine project located 45 minutes from Dawson City, Yukon. Step-out drill holes at the Golden Zone along Brewery Creek’s prolific Reserve Trend have extended mineralization an additional 400 m along strike to the east of the historical lower Golden pit. These step-out holes tested a previously undrilled 500 m long segment of the projected mineralized structural zone extending from the Golden pit to the Lucky Pit. The mineralization remains open along strike to the northeast and at depth. Golden Predator CEO Janet Lee-Sheriff said “The original resource modeling at Brewery Creek identified small, discrete deposits which imposed significant limitations on the design and operation of the mine. The 2019 drill results, in conjunction with the recently announced updated resource estimation, suggest a very different interpretation which will allow the Company to aggressively target additional undrilled mineralization in 2020 to further increase the currently reported mineral resource. A new resource estimate is scheduled for the second quarter to incorporate the 2019 drill data.”

Highlights of the Golden Zone 2019 drill program include:

2019 drill results to date have confirmed continuous gold mineralization over a 2.8 km strike length along the Reserve Trend. Modelling indicates that the previously separate Fosters, Kokanee and Golden resource areas have coalesced into a single continuous mineralized zone which remains open to the northeast.

Step-out drilling highlights along 400m of previously untested strike include:
10.7 m of 1.39 g/t Gold from a depth of 9.1 m in hole RC19-2614;
12.2 m of 2.60 g/t Gold from a depth of 22.9 m in hole RC19-2624;
7.6 m of 1.24 g/t Gold from a depth of 29.0 m in hole RC-2659.

In-fill drilling continued to improve resource confidence as demonstrated below:
9.2 m of 3.9 g/t Gold from a depth of 24.4 m in hole RC19-2646;
19.8 m of 0.56 g/t Gold from a depth of 15.2 m in hole RC19-2596. 紧固件展-2020第二十一届广州国际紧固件及设备展览会-巨浪展览 -The 21st China (Guangzhou)Int’l Fastener & Equipment Exhibition - Fastener exhibition,2020 Fastener exhibition, China Fastener exhibition, Guangzhou Fastener exhibition, 2020 Fastener expo, China Fastener expo, Guangzhou Fastener expo 编辑/来源:紧固件展-紧固件采购会-国际紧固件展-fastener expo


Copyright © 1996-2023  JULANG.COM.CN Stone Rich Sight. All Rights Reserved
Add:Room 3A05-3A06,Building A1,Xinghui Park,Huaming Road 29,Pearl River New City,Guangzhou,510623,China