首 页 | 关于我们 | 展会介绍 | 新闻中心 | 参展商手册 | 展位费用 | 展位分布图 | 展览回顾 | 媒体支持 | 联系我们 | ENGLISH
 新闻类别
展会资讯
行业新闻
公司动态
媒体报道
 新闻详细
     
A game of two halves for ArcelorMittal-弹簧展-2015第十六届广州国际弹簧工业展览会-全球最大弹簧展会-巨浪展览-The 16th China(Guangzhou)Int’l Spring Industry Exhibition
2014年11月10日  弹簧展- -全球最大弹簧展会- Spring Industry Exhibition
---------------------------------------------------------------------------------------------------------------
    

The steel will come from ArcelorMittal''s production sites in France, Luxembourg, and Spain and will consist of 4.2kt of steel beams of S275 and S355J0 grades (from Luxembourg) and 500 tonnes of tubes from Spain. The company is also supplying 70,000 m2 of steel for the interior trim, including a giant perforated canopy using ArcelorMittal’s branded Frequence roofing profile produced in France. The canopy will protect the crowd against the elements and serve as a sound insulator. The company will also supply 20,000 m2 of Cofraplus open-rib composite floor decks produced in France.

According to ArcelorMittal, some 12kt of steel will be used for the stadium''s frame and this is said to be twice the amount of steel used to build to Eiffel Tower in Paris. The steel will be used for the structure of the north and south stands, the framework of the upper tier, the roof structure and most of the cladding, including the underside of the upper terraces and all the roof supports and covers. The venue includes 644 round steel columns (up to 37 metres tall) that mimic trees in a forest.

In more conventional structures, concrete has been the material of choice, but using steel significantly reduces the weight

Hervé Bourrier, CEO of ArcelorMittal France, who paid a recent visit to the construction site, said that ArcelorMittal is a major player in the construction sector and has a wide range of products and solutions for both the structure and frame of major buildings like the Nouveau Stade de Bordeaux. He said the company offered ''many innovations'' to satsify the needs on an increasingly demanding construction sector in terms of technical and aesthetic requirements.

The new stadium is one of 10 venues hosting the UEFA EURO 2016 championships in France. It is located between a man-made lake and the Garonne river in northern Bordeaux and will replace Stade Chaban-Delmas, which was a World Cup venue in 1938 and 1998.

The stadium was designed by the Swiss firm Herzog & de Meuron.



弹簧展-2015第十六届广州国际弹簧工业展览会-全球最大弹簧展会-巨浪展览-The 16th China(Guangzhou)Int’l Spring Industry Exhibition

版权所有 Copyright © 1996-2023  广州巨浪展览策划有限公司  粤ICP备05023181号
地址:广州市天河区珠江新城华明路29号星汇园A1座3A05-3A06室 邮编:510623  电话:020-38620790传真:020-38620781