Home AboutUs Exhibition
Info
News
Center
Exhibitor
Manual
Cost of
Participation
Floor
Plan
Exhibition
Retrospect
Media
Support
Contact Chinese
 News Type
Exhibition News
Industry News
Company News
Media reports
 New Detail
     
Jindal Shadeed and SMS Group commission new billet caster-The 20th China (Guangzhou ) Int’l Casting product Exhibition
4/26/2019  - casting expo-Die-casting expo-foundry expo
---------------------------------------------------------------------------------------------------------------
    indal Shadeed Iron & Steel LLC in Sohar Oman and SMS group have successfully put a new high-speed billet caster with six strands into operation. 42 heats in sequence could be cast within just over a month after start-up, which represents an impressive ramp-up curve. The continuous casting machine was designed and commissioned in cooperation with SMS Concast, a company of SMS group. It is currently operating with six strands and produces rebar billets of 165 millimeters square section at a casting speed of 3.6 meters per minute. However, provision is made for eight strands and square billets with a section range from 130 up to 200 millimeters. These billets shall be produced at casting speeds ranging from 1.0 to 5.0 meters per minute and shall reach an annual capacity of 2,000,000 tons. Apart from the integrated CONVEX mold technology, it is planned to install further technological solutions by SMS Concast in order to enable the production of SBQ steel grades. These grades need a closed casting mode with submerged entry nozzles. In this mode, the future CONFLOW stopper control will optimally ensure a stable steel flow. In order to achieve the desired high-level steel qualities, the application of electromagnetic mold stirrers is on the agenda, too. The integration of CONSTIR-MEMS electromagnetic stirrers permits product quality control to be improved in terms of center segregation and center porosity.

Mr Sanjay Anand, Chief Operating Officer at JSIS Oman, congratulates the team led by Vishnu Vijay, (Head Project & Rolling Mill), and the SMS team on commissioning the project within four months from first major equipment delivery to site: “Thanks to the great cooperation of the project teams, we were able to achieve an impressive ramp-up in production. 42 heats in sequence were cast within 45 days after commissioning.” 铸件展-铸件采购会-国际铸件展-2019第二十届广州国际铸件展-巨浪展览 -The 20th China (Guangzhou ) Intl Casting product Exhibition -Casting product Exhibition, 2019 casting product Exhibition, China Casting product Exhibition, Casting Exhibition, China Casting Exhibition, 2019 Casting Exhibition, Casting product Expo, 2019 casting product Expo, China Casting product Expo, Casting Expo, China Casting Expo, 2019 Casting Expo, 
Copyright © 1996-2023  JULANG.COM.CN Stone Rich Sight. All Rights Reserved
Add:Room 3A05-3A06,Building A1,Xinghui Park,Huaming Road 29,Pearl River New City,Guangzhou,510623,China