Home AboutUs Exhibition
Info
News
Center
Exhibitor
Manual
Cost of
Participation
Floor
Plan
Exhibition
Retrospect
Media
Support
Contact Chinese
 News Type
Exhibition News
Industry News
Company News
Media reports
 New Detail
     
SAIL's Barsua iron mine resumes production to increase iron ore output-The 19th China (Guangzhou ) Int’l Casting product Exhibition
5/29/2018  铸件展-casting expo-Die-casting expo-foundry expo
---------------------------------------------------------------------------------------------------------------
    Barsua iron mine has resumed production after 4 years shutdown which was mainly operated by SAIL''s raw material department (RMD). 

After the reopening of the Barsua iron mine, the blast furnaces at Rourkela and Parvati blast furnaces have also resumed their normal production, and both blast furnaces were the biggest and most technologically more advanced, which will produce 1.015 million tons of hot metal per year.

The Barsua iron mine was originally shut down in May 2014 due to certain legal issues. In a statement issued by SAIL, The Supreme Court of India made a favorable judgment on SAIL on May 11th this year and allowed the Barsua iron mine to resume production. 铸件展-铸件采购会-国际铸件展-2018第十九届广州国际铸件展会-巨浪展览 -The 19th China (Guangzhou ) Int’l Casting product Exhibition -Casting product Exhibition, 2018 casting product Exhibition, China Casting product Exhibition, Casting Exhibition, China Casting Exhibition, 2018 Casting Exhibition, Casting product Expo, 2018 casting product Expo, China Casting product Expo, Casting Expo, China Casting Expo, 2018 Casting Expo, 
Copyright © 1996-2023  JULANG.COM.CN Stone Rich Sight. All Rights Reserved
Add:Room 3A05-3A06,Building A1,Xinghui Park,Huaming Road 29,Pearl River New City,Guangzhou,510623,China