Home AboutUs Exhibition
Info
News
Center
Exhibitor
Manual
Cost of
Participation
Floor
Plan
Media
Support
Contact Chinese
 News Type
Exhibition News
Industry News
Company News
Media reports
 New Detail
     
ArcelorMittal Liberia Plans Restart of Phase 2 Expansion Project有色金属展-铜材展-2021年广州国际有色金属工业(铜业)展览会 -2021 China(Guangzhou)Int’l Non-Ferrous Metal(Copper)Exhibition
6/17/2021  有色金属展-铜材展-non-ferrous metals expo
---------------------------------------------------------------------------------------------------------------
    

Liberian Senate President Pro Tempore Mr Albert Tugbe Chie, a geologist, visited to the ArcelorMittal Liberia’s mining operations in Tokadeh in Nimba County and inspected ongoing preparatory work for the resumption of construction of a concentrator and other state of the art mining infrastructures. Mr Albert Chie expressed optimism about the transformational impact that the ArcelorMittal Liberia expansion project will have on the country’s economy and the many benefits to be accrued in jobs, revenue generation, and other critical areas and pledged to work with other legislators to support the AML expansion project and plan for the future. He said “Government sees this as a ground breaking investment that will provide many jobs and training for Liberians to take up major technical and professional roles within the company.”

ArcelorMittal Liberia’s Acting Chief Executive Officer Mr Johannes Heystek emphasized AML’s readiness to accelerate on going progress on the expansion project and assured of the company’s commitment to increasing investment in Liberia as a strategic partner to the country. He said ArcelorMittal Liberia is excited by the visit of the President Pro Tempore and expressed the hope that as someone with a rich mining and geological expertise, he would be an ambassador for the expansion project.

ArcelorMittal Liberia plans to restart the expansion of its iron-ore operations in Liberia this year. The Phase 2 project was brought to a halt when on-site contracting companies pulled out with the onset of the Ebola crisis in West Africa in 2014. ArcelorMittal recently completed a revised feasibility study for the modular build of a 15 million tonne concentrator, with aligned mine, concentrator, rail and port capacity. About USD 800 million would be required to complete the brownfield project. First concentrate is expected in the fourth quarter of 2023.

ArcelorMittal Liberia has been operating a five-million-tonne direct shipping ore project since 2011 and started an expansion to 15-million tonnes a year in 2013.























































-Non-Ferrous Metal exhibition, 2021 Non-Ferrous Metal exhibition, Non-Ferrous Metal expo, 2021 Non-Ferrous Metal expo, Copper exhibition, Copper expo, 2021 Copper exhibition, 2021 Copper expo, China Copper exhibition, China Copper expo 

Copyright © 1996-2023  JULANG.COM.CN Stone Rich Sight. All Rights Reserved
Add:Room 3A05-3A06,Building A1,Xinghui Park,Huaming Road 29,Pearl River New City,Guangzhou,510623,China