Home AboutUs Exhibition
Info
News
Center
Exhibitor
Manual
Cost of
Participation
Floor
Plan
Exhibition
Retrospect
Media
Support
Contact Chinese
 News Type
Exhibition News
Industry News
Company News
Media reports
 New Detail
     
Primetals Technologies to modernize Severstal hot strip mill at Cherepovets steel works-The 19th Guangzhou Die-casting, Foundry & Industry Furnace Exhibition
5/24/2018  压铸展-铸造展- Die-casting expo-foundry expo
---------------------------------------------------------------------------------------------------------------
    Primetals Technologies has received an order from Russian steel producer PAO Severstal to modernize the company ?s hot strip mill “HSM 2000” in its Cherepovets steel works. Main targets are to improve tolerances of product width and thickness control as well as to improve overall production quality for further processing and efficient production of new products. Also, operational safety and working conditions will be improved. To these ends, an edger of the hot strip mill will be upgraded, short stroke HAGC (hydraulic gap control cylinders) will be installed in the finishing mill, and the cooling line will be outfitted with a Power Colling unit. The latter allows for an alloy-saving production of high-end steel grades. In addition, a Primetals Technologies level 2 control model consisting of physical process models with advanced optimization strategies and neural network algorithms for adaptation will be installed.

Severstal Russian Steel Division is a part of PAO Severstal, a vertically integrated steel and steel-related mining company with major assets in Russia as well as investments in other regions. Steel production volume of PAO Severstal in 2017 was around 11.65 million metric tons of liquid steel. The steel is used to make a large number of end products, including hot- and cold-rolled flat steel, galvanized and coated products, and long products. At the “HSM 2000”, Primetals Technologies will install new mechanic, hydraulic and electric equipment and implement the corresponding automation solutions and process models.

To improve strip thickness control in addition to the existing mechanical screw down system, short stroke hydraulic gap setting cylinders will be implemented in the first three stands (F6 to F8) of the finishing mill.

The technological key functions will be replaced with the latest state of the art control algorithms. The existing level 2 system will be upgraded to extend lifetime and include present technological models. Profile and flatness control models will be added as new functions.

The cooling section will be controlled by an entirely new automation system, ensuring the correct cooling strategy and cooling path as defined by the coiling temperature and the cooling rate is followed. Strip temperature tracking already starts at the roughing mill exit. A Comprehensive Temperature Control will be supplied for coordinated control of finishing mill speed, inter-stand cooling and coiling temperature.

The cooling section control includes intelligent water management to cope with the highly dynamic requirements of large water flow rates. The run-out roller table downstream from the finishing mill conveys the strip through the laminar cooling line to the down coiler groups 1 and 2. In cooling section 1, right after the finishing mill, a new Power Cooling system will be installed. Also, the laminar cooling headers in this section will be renewed. In section 2, only the trimming headers will be replaced. 压铸展-铸造展-2018第十九届广州国际压铸、铸造及工业炉展览会-中国最受关注的压铸铸造展会-巨浪展览 -The 19th Guangzhou Die-casting, Foundry & Industry Furnace Exhibition -Die-casting exhibition, Die-casting expo,2018 Die-casting exhibition, 2018 Die-casting expo, China Die-casting exhibition, China Die-casting expo, Foundry exhibition, Foundry expo, 2018 Foundry exhibition, 2018 Foundry expo, Industry Furnace exhibition, Industry Furnace expo, 2018 Industry Furnace exhibition, 2018 Industry Furnace expo, China Industry Furnace exhibition, China Industry Furnace expo
Copyright © 1996-2023  JULANG.COM.CN Stone Rich Sight. All Rights Reserved
Add:Room 3A05-3A06,Building A1,Xinghui Park,Huaming Road 29,Pearl River New City,Guangzhou,510623,China