Home AboutUs Exhibition
Info
News
Center
Exhibitor
Manual
Cost of
Participation
Floor
Plan
Exhibition
Retrospect
Media
Support
Contact Chinese
¡¡News Type
Exhibition News
Industry News
Company News
Media reports
¡¡New Detail
     
G¨¹del Introduces ArcTrack, Preconfigured TMF for High-volume Robotic Welding-The 19th Guangzhou Die-casting, Foundry & Industry Furnace Exhibition
11/1/2017  Die-casting expo-foundry expo
---------------------------------------------------------------------------------------------------------------
    

Gudel introduces ArcTrack, a preconfigured robot track motion module for arc welding applications that delivers the highest flexibility and reduces lead time by 40 percent.

G¨¹del, the global manufacturer of linear motion modules, robot track motion units, gantry robots and components, introduces ArcTrack, a preconfigured robot track motion module for arc welding applications that delivers the highest flexibility and reduces lead time by 40 percent.

G¨¹del has pre-engineered a TrackMotion Floor (TMF-2) configuration with an auxiliary shelf to carry welding equipment, large wire spools and torch cleaning and reaming devices with the robot. The shelf is pre-engineered to support over 750 kg with no compromise in performance. The ArcTrack is available for all leading arc welding robots, including Fanuc, ABB, Motoman and KUKA, and includes robot-specific gear boxes, motors and cables.

All G¨¹del TrackMotion units are designed and engineered for harsh environments, including welding, painting, die cast, foundry, sealing, machining and grinding. G¨¹del¡¯s unique cam follower and cartridge bearing design handle the worst environments, and enable 15-minute MTTR for bearing replacement. The ArcTrack is configured with guideway scrapers and a fully enclosed e-chain for the final layer of protection.

G¨¹del TrackMotion units, including the ArcTrack, are available in lengths from 3¨C100 meters, and can be equipped with robot risers from 50¨C600 mm. Because ArcTrack is a standard engineered solution, lead times are reduced to 8¨C10 weeks from order.

-The 19th Guangzhou Die-casting, Foundry & Industry Furnace Exhibition -Die-casting exhibition, Die-casting expo,2018 Die-casting exhibition, 2018 Die-casting expo, China Die-casting exhibition, China Die-casting expo, Foundry exhibition, Foundry expo, 2018 Foundry exhibition, 2018 Foundry expo, Industry Furnace exhibition, Industry Furnace expo, 2018 Industry Furnace exhibition, 2018 Industry Furnace expo, China Industry Furnace exhibition, China Industry Furnace expo

Copyright © 1996-2023¡¡ JULANG.COM.CN Stone Rich Sight. All Rights Reserved
Add:Room 3A05-3A06,Building A1£¬Xinghui Park,Huaming Road 29,Pearl River New City,Guangzhou,510623,China