|
|
|
|
Eneco Wins Tender for 100 MW Maasvlakte 2 Wind Farm in Netherlands—The 21st China(Guangzhou)Int’l Heat Treatment, Industrial Furnace Exhibition 3/3/2020 热处理展-工业炉展-heat treatment expo-furnace expo |
--------------------------------------------------------------------------------------------------------------- |
|
Dutch producer and suppliers of natural gas, electricity and heat, Eneco has announced that it has won the tender for the planned Maasvlakte 2 wind farm in the Netherlands. Rijkswaterstaat, the executive agency of the Dutch Ministry of Infrastructure and Water Management announced the results of this tender recently, granting Eneco the rights to be able to realise its plan to build a wind farm with a capacity of more than 100 MW on the sea wall of Maasvlakte 2.
The new wind farm will generate around 416 GWh of green power, corresponding to the energy consumption of 138,000 households.
The firm expects to start the preparations for the construction in 2022, which would mean that the wind farm could start producing green power in 2023 at the latest, for a period of 25 years. As of 2023, Rijkswaterstaat will purchase all the green power generated by the wind farm.
热处理展-工业炉展-2020第二十一届广州国际热处理、工业炉展览会-中国效果最好的热处理工业炉展--巨浪展览
—The 21st China(Guangzhou)Int’l Heat Treatment, Industrial Furnace Exhibition
-Heat Treatment exhibition, Heat Treatment expo, 2020 Heat Treatment exhibition, 2020 Heat Treatment expo, China Heat Treatment exhibition, China Heat Treatment expo, Industrial Furnace exhibition, Industrial Furnace expo, 2020 Industrial Furnace exhibition, 2020 Industrial Furnace expo, China Industrial Furnace exhibition, China Industrial Furnace expo
|
|
|
|
|