Home AboutUs Exhibition
Info
News
Center
Exhibitor
Manual
Cost of
Participation
Floor
Plan
Exhibition
Retrospect
Media
Support
Contact Chinese
 News Type
Exhibition News
Industry News
Company News
Media reports
 New Detail
     
More Positive Drill Results from TriStar Castelo De Sonhos Project-The 21st China (Guangzhou)Int’l Fastener & Equipment Exhibition
3/3/2020  紧固件展-紧固件采购会-国际紧固件展-fastener expo
---------------------------------------------------------------------------------------------------------------
    TriStar Gold Inc announced additional results from the drilling campaign at its Castelo de Sonhos gold project. President and CEO Nick Appleyard said "The infill drill program continues to deliver good results. A core rig is now on site and preparing to do some infill drilling as well as geotechnical work required for the pre-feasibility study. Early in March we will release one (of the two on site) RC rig, which will allow us to keep an RC rig on site for use as the GoldSpot Discoveries work starts to develop targets for exploration upside drilling."

This month TriStar Gold has received results for 16 reverse-circulation (RC) drill holes completed in December, (of a planned total of approximately 200 holes). Significant intersections from these drill results include:
20m @ 1.3 g/t from 100-120m in RC-19-399
13m @ 1.1 g/t from 35-48m in RC-19-400
3m @ 9.3 g/t from 39-42m in RC-19-409, includes 1m @ 26.6 g/t from 39-40m

True widths are approximately 90% of the downhole lengths reported above. 紧固件展-2020第二十一届广州国际紧固件及设备展览会-巨浪展览 -The 21st China (Guangzhou)Int’l Fastener & Equipment Exhibition - Fastener exhibition,2020 Fastener exhibition, China Fastener exhibition, Guangzhou Fastener exhibition, 2020 Fastener expo, China Fastener expo, Guangzhou Fastener expo
Copyright © 1996-2023  JULANG.COM.CN Stone Rich Sight. All Rights Reserved
Add:Room 3A05-3A06,Building A1,Xinghui Park,Huaming Road 29,Pearl River New City,Guangzhou,510623,China