Home AboutUs Exhibition
Info
News
Center
Exhibitor
Manual
Cost of
Participation
Floor
Plan
Exhibition
Retrospect
Media
Support
Contact Chinese
 News Type
Exhibition News
Industry News
Company News
Media reports
 New Detail
     
Hoa Sen to build giant steel complex at Ninh Thuan in Vietnam- The 18th China(Guangzhou ) Int’l tube & pipe Processing Equipment Exhibition
8/31/2016  管材展-钢管展-steel tube expo-tube &pipe expo
---------------------------------------------------------------------------------------------------------------
    VNS reported that Hoa Sen Group will build a steel plant with a capacity of 16 million tonnes a year in the south-central province of Ninh Thuan at a cost of USD 10.6 billion. Construction will be done in five stages between 2017 and 2031. The steel giant said the first stage would be built in 2017-18 on an area of 240ha, begin operation in 2019 and produce 1.5 million tonnes of steel a year.

Simultaneously, infrastructure will be developed for the Hoa Sen Ca Na Industrial Zone and the Hoa Sen Ca Na port will be built.

The company revealed that in future many other facilities would be built to recycle waste from the steel plant, including a cement company.

Five companies have been set up to carry out the projects -- the Hoa Sen Ca Na Zone Infrastructure Development One-member Joint Stock Company, the Hoa Sen Ca Na – Ninh Thuan Steel-making Complex Investment One-member Joint Stock Company, the Hoa Sen Ca Na – Ninh Thuan Port One-member Joint Stock Company, and the Hoa Sen Ca Na – Ninh Thuan Cement One-member Joint Stock Company.

Hoa Sen is a leading steel maker not just in Viet Nam but in the Southeast Asian region. In Viet Nam, it has a 40 per cent share of the sheet steel market and 20 per cent of the steel pipe market. - The 18th China(Guangzhou ) Int’l tube & pipe Processing Equipment Exhibition
Copyright © 1996-2023  JULANG.COM.CN Stone Rich Sight. All Rights Reserved
Add:Room 3A05-3A06,Building A1,Xinghui Park,Huaming Road 29,Pearl River New City,Guangzhou,510623,China